Top issues during term (18)(Roads)
Airport Apron Expansion funding and services
State grants of $115,868 and $12,593 come with equal local matches; the services contract is about 15% of project cost, and the project sits under its $6 million budget.
Downtown Main Street paving completed
Repair costs not yet determined; the cause is still under investigation.
Winter snow removal contracting
Contract amounts still to be announced Monday.
Downtown mill and overlay
Engineering fee not yet determined; bid award would follow a roughly three-week advertising period.
Exit 12 off-ramp congestion
Colorado Boulevard BUILD Grant
No local match required for the grant itself, but full improvements were estimated at $41 million and would enter future budgets only if awarded.
Canyon Street rec path grant
$2,200 for the engineering application; grant would fund construction if awarded.
Sandstone Hills street remediation
The bid came in well under estimate, freeing about $140,000 that could go back into street repairs.
TAP grant for Jorgensen Park to Creekside Elementary path
Rad Route to School grant application
Grant would cover most costs if awarded; the city intends to provide matching funds, plus $2,200 for engineering application work.
Major construction projects funded and awarded
Over $5.3 million in construction contracts, much of it offset by FAA and state grants for the airport work.
Three-lane redesign of Main Street and Colorado Boulevard
No decision made; costs of a demo project not yet determined.
Burno Gulch Road maintenance
Road upkeep currently falls on the property owner, who blades and maintains the road himself.
Hillsview Street bridge pathway reopening
Four-way stop at Jackson and Jonas Boulevards
ADA sidewalk compliance downtown
$27,000 estimated, potentially less on an hourly contract.
Traffic and safety at St. Onge Road and Highway 85
A DOT roundabout project at Highway 85 and St. Onge Road is planned, materials for which are available at city offices.
Sawmill Road and Sawmill Avenue Projects
$752,271 construction plus up to $84,500 in engineering, well under the $1.5 million budget.